E-Scrap & Battery Recycling

Tinci's Six-Line Waste LFP Battery Recycling Project Enters EIA Review in Jiujiang

Tinci's waste LFP and ternary battery recycling project in Jiujiang, Jiangxi — six production lines spanning pre-treatment, cascade utilization and lithium carbonate — has been accepted for EIA review.

East China's Jiangxi (Jiujiang): Tinci's 6 Production Lines Battery R - Shanghai Metals Market
East China's Jiangxi (Jiujiang): Tinci's 6 Production Lines Battery R - Shanghai Metals MarketAI-generated

Waypoints

  1. Tinci's waste lithium battery recycling project in Jinshawan Zone, Hugao County High-tech Industrial Park, Jiujiang, Jiangxi, has been accepted for environmental impact assessment review.

  2. The project comprises six processing systems: LFP renovation/recycling (two pre-treatment lines, one cathode sheet line, one hydrometallurgical line), one LFP pack cascade utilization line, a combined LFP/ternary pre-treatment system, iron phosphate hydrometallurgical recovery, nickel-cobalt-manganese salt production, and lithium carbonate production.

  3. The lithium carbonate block includes two high-purity lines and one battery-grade lithium carbonate line; no investment figure, tonnage capacity, or commissioning date appears in the filing.

Guangzhou Tinci Materials' waste lithium battery resource recycling project in Jiujiang, Jiangxi province, has cleared its first regulatory gate. An environmental impact assessment (EIA) disclosure shows the local authority has accepted the project for review, moving a six-production-line recycling scheme into the formal permitting pipeline.

The site sits in the Jinshawan Zone of the Hugao County High-tech Industrial Park in Jiujiang, East China's Jiangxi province. The design is unusual in its breadth: rather than a single pre-treatment-plus-recovery configuration, the project stacks six distinct processing systems on one site, covering everything from pack-level cascade utilization through to finished battery-grade lithium carbonate.

Six systems, six functions

The first system handles renovation and recycling of waste LFP (lithium iron phosphate) battery material. It comprises two LFP battery pre-treatment lines, one cathode sheet pre-treatment line, and one hydrometallurgical recovery line dedicated to LFP-derived material.

A second system addresses cascade utilization — repurposing whole waste LFP battery packs before they reach end-of-life dismantling. The filing specifies one cascade utilization production line for this stage, which typically captures residual capacity value from packs retired from electric vehicles and storage applications.

The third system broadens the intake beyond LFP. It adds one further LFP battery pre-treatment line, one ternary (nickel-cobalt-manganese) battery pre-treatment line, and one LFP cathode sheet pre-treatment line. The ternary line matters for the downstream chemistry: it feeds nickel and cobalt units that an LFP-only plant would lack.

The remaining three systems convert intermediate material into products. An iron phosphate hydrometallurgical recovery system will process the LFP-derived stream. A nickel-cobalt-manganese salt production system will take output from the ternary pre-treatment line. Finally, a lithium carbonate production system will run two high-purity lithium carbonate lines and one battery-grade lithium carbonate line, closing the loop back toward cathode-material-grade feedstock — Tinci's core business as an electrolyte and battery materials producer.

Announced project, not built capacity

The filing status deserves emphasis. Acceptance for EIA review is an early-stage milestone in China's project approval sequence; it precedes approval, construction, and commissioning. No commissioning date, tonnage capacity, or investment figure appears in the disclosure. Until the EIA clears and construction details surface, this remains an announced project on paper, not operating capacity in the Jiangxi recycling fleet.

That distinction is becoming more important in China's lithium battery recycling sector, where project announcements have outpaced commissioned tonnage. Tinci's configuration — pairing pre-treatment, hydrometallurgy, cascade utilization, and salt production under one permit — signals an integrated hub strategy rather than a tolling or collection operation. Vertical integration of this kind lets a cathode-chain materials producer internalize recycled lithium carbonate and nickel-cobalt-manganese salts as feedstock, hedging against primary commodity price swings.

The location choice also fits the regional map. Jiujiang sits on the Yangtze in northern Jiangxi, within reach of both central China's battery manufacturing belt and the retired-pack volumes now exiting first-generation electric vehicles. Jiangxi itself hosts a cluster of hydrometallurgical recycling capacity, and the Hugao County High-tech Industrial Park offers the designated chemical-industry zoning that mixed pre-treatment and hydrometallurgical operations require.

What the chemistry implies for material streams

The line count tells a story about feedstock expectations. Three of the six systems — the renovation system, the cascade utilization line, and the iron phosphate recovery system — target LFP exclusively. LFP chemistry now dominates Chinese EV and stationary storage deployments, and the first large retirement waves of LFP packs are arriving at end of life. LFP recycling economics hinge on lithium recovery, since the cathode carries no nickel or cobalt value; hence the dedicated lithium carbonate lines at the back end of the flowsheet.

The single ternary pre-treatment line and the nickel-cobalt-manganese salt system serve the higher-value NCM stream. Splitting the two chemistries at pre-treatment avoids the contamination and process-compatibility problems that mixed-chemistry feedstocks create for hydrometallurgical plants.

The lithium carbonate block's three lines — two high-purity, one battery-grade — indicate the project aims at cathode-qualifying output rather than industrial-grade sale. Battery-grade lithium carbonate from recycled material competes directly with primary supply, and integrated producers can blend recycled units into existing qualification channels.

Next milestone

The deciding step is the EIA approval itself. Under China's environmental permitting process, acceptance for review triggers a public comment window and technical evaluation by the ecological environment authority. Approval would unlock construction permitting; rejection or revision demands would push the timeline back. Watch the Jiujiang ecological environment bureau's disclosure portal for the review outcome — that document, not the announcement, will determine whether Tinci's six-line scheme converts from filing to steel.

via imgqn.smm.cn (Original)

Share this article:

More from Daniel Okafor

Daniel Okafor

Show full bio

Correspondent covering consumer brands and retail at Circular Wire.

132 articles

Nearby routes

« Previous articleNext article »