Compliance & Policy
119 Objections Push 200 MW Bendemeer Solar and Battery Project to NSW IPC
NSW DPHI deemed Athena Energy's 200 MW solar and 300 MWh battery project approvable, but 119 objections — 19 above threshold — send it to the IPC for a final decision.

Waypoints
119 objections, 19 above the 100-objection threshold, triggered IPC review of the 200 MW solar and 150 MW / 300 MWh battery project
DPHI assessed the 369-hectare Bendemeer project as approvable subject to conditions
Athena cut the development footprint by ~107 hectares and offered a ~$4.4 million Voluntary Planning Agreement
IPC public meeting set for 5 December 2026; written submissions close 13 December 2026
EIS exhibition drew 232 submissions: 109 supporting, 119 objecting, 4 commenting
A 200 MW solar farm with a 150 MW / 300 MWh battery energy storage system near Bendemeer, New South Wales, has been referred to the state's Independent Planning Commission (IPC) after attracting 119 public objections — 19 above the 100-objection threshold that forces a Commission assessment under NSW planning law.
The NSW Department of Planning, Housing and Infrastructure (DPHI) deemed the project "approvable subject to conditions" in its referral, but the objection count removed the decision from the department's hands. The IPC must now rule on the information supplied by the department and any new evidence gathered through its own process.
The developer is Athena Energy, the Australian subsidiary of Singapore-based Metis Energy. The site sits on 369 hectares of sheep and cattle grazing land near the township of Bendemeer, roughly 35 kilometres northeast of Tamworth in the New England region.
The solar and storage project forms one stage of the proposed Bendemeer Renewable Energy Hub, which could also deliver a separately assessed 360 MW wind farm.
What did the department's assessment find?
DPHI said it visited the site, consulted local residents, Tamworth Regional Council and relevant government agencies before concluding the project would not cause significant impacts on the local community or the environment.
"Overall, the Department's assessment concludes that the project would result in benefits to the state of NSW and considers the project is in the public interest," the department wrote in its referral documents.
Public exhibition of the project's Environmental Impact Statement drew 232 unique submissions: 109 in support, 119 objections and four providing comments.
Objectors raised site suitability, water quality and hydrology, biodiversity, amenity, property values, and the sharing of project benefits with the community.
How has the design changed?
According to DPHI documents, the project has been progressively "designed and refined" by Athena to avoid and minimise negative impacts. Since launch, the developer has:
- reduced the development footprint by approximately 107 hectares;
- refined the design in stages to cut native vegetation clearing; and
- established a proposed conservation area within the site boundary.
Athena has also reached an in-principle agreement with Tamworth Regional Council for a Voluntary Planning Agreement carrying a developer contribution of approximately $4.4 million.
The footprint reduction is equivalent to roughly 29% of the 369-hectare site — land that returns to its established grazing use rather than hosting panels or battery infrastructure.
What happens next?
The IPC will hold a public meeting at the Bendemeer Town Hall on 5 December 2026 to inform its decision. Written submissions to the Commission close on 13 December 2026.
The Commission's determination settles two linked questions: whether the DPHI-endorsed conditions hold against the objectors' concerns, and whether the solar and battery stage proceeds while the separate 360 MW wind farm assessment runs its own course. Both deadlines in December 2026 mark the point at which the Bendemeer Renewable Energy Hub either gains its anchor project or returns to redesign.
via pv-magazine-australia.com (Source)
More from Rebecca Stone
Show full bio
News editor covering companies, deals and strategy in Circular economy and the environmental industry at Circular Wire.
503 articles