Cleantech & Investment

Nigeria Commissions Five CNG Stations in Lagos, 8,400 Vehicles Per Day

Five new Lagos CNG stations add 45,640 scm of storage and capacity for 8,400 daily vehicle fills, part of a federal plan for 1,000 outlets nationwide.

FG unveils five CNG stations in Lagos
FG unveils five CNG stations in LagosFerdinand Asakome / unsplash

Waypoints

  1. Five CNG stations commissioned in Lagos, each with 24,000 scm/day compression capacity

  2. Combined storage of 45,640 scm can serve about 8,400 vehicles daily at full capacity

  3. 9 of 15 planned Ibile stations now operational; remaining 6 due Q1 2027

  4. Federal target: 1,000 CNG refuelling outlets nationwide, with 500 additional stations directed by President Tinubu

Five new compressed natural gas stations went live in Lagos State this week, adding a combined storage capacity of 45,640 standard cubic metres and the ability to fill roughly 8,400 vehicles per day at full capacity. That is the operating number that matters for Nigeria's transport fuel market, and it lands inside a federal programme targeting 1,000 CNG outlets nationwide.

The Minister of State for Petroleum Resources (Gas), Ekperikpe Ekpo, commissioned the facilities at Idimu, Ogolonto, Abule Egba, Ajah and Oko-Oba. The Lagos State-owned Ibile Oil and Gas Corporation developed them in partnership with the Midstream and Downstream Gas Infrastructure Fund (MDGIF).

What does each station actually deliver?

On a per-site basis, the numbers break down cleanly:

  • Compression capacity: 24,000 standard cubic metres per day at each of the five stations
  • Storage: 9,800 standard cubic metres per station
  • Combined throughput target: about 8,400 vehicle fills per day across the five sites
  • Feedstock: natural gas produced domestically in Nigeria

For transport operators, that scale matters more than ribbon-cuttings. Oluwole Adama, Executive Director of MDGIF, framed the case plainly: "Together, the five stations at Abule Egba, Ajah, Oko-Oba, Idimu and Ogolonto can hold 45,640 standard cubic metres of gas. At full capacity, they can fill about 8,400 cars per day, using natural gas produced right here in Nigeria."

How does this fit the national build-out?

President Bola Tinubu has directed the expansion of CNG infrastructure, including an additional 500 refuelling stations toward a planned national network of 1,000 outlets. Ekpo positioned the Lagos facilities within that directive.

"For a dynamic economy such as Lagos, the implications are significant. Every additional CNG station expands the ecosystem required to give motorists and commercial transport operators a viable alternative fuel. It brings cleaner gas closer to the point of consumption and supports our broader objective of making CNG increasingly accessible across Nigeria," Ekpo said.

The minister also set the measurement standard for the programme — and it is not station counts. "Our objective is therefore not simply to count the number of stations commissioned. Success must ultimately be measured by impact: whether the infrastructure helps reduce operating costs for transporters and businesses, whether those savings reach commuters, and whether Nigerian families begin to feel tangible relief," he said.

What is built versus what is promised?

The Lagos programme under Ibile Oil and Gas carries a mandate of 15 stations across the state. The status split is now clear:

  • Operational: 9 stations — the five new sites plus earlier facilities at Ikota, Agege, Ogudu and Ojota
  • In progress: 6 stations — at different stages of completion, with inauguration targeted for the first quarter of 2027

Ibile CEO Tayo Gbajumo said the initiative aims to expand access to affordable energy, cut transportation costs for businesses and households, and support adoption of CNG-powered vehicles.

What are the operating risks?

Adama flagged the conditions that decide whether these assets perform: reliable gas supply, proper maintenance and strict adherence to safety standards. He also noted the projects should generate employment across operations, safety, maintenance, logistics and technical services.

"Of course, inauguration is only the beginning. The real achievement will be safe operations, reliable supply, professional maintenance and lasting public confidence. At MDGIF, we want infrastructure that works every day, not infrastructure that looks impressive only on commissioning day," Adama said.

What happens next?

The milestone to watch is the first quarter of 2027, when the remaining six Ibile stations are due for commissioning to complete the 15-station Lagos mandate. Before that, the practical test is throughput: whether the 8,400-fills-per-day design capacity translates into measurable cost reductions for transporters and commuters — the metric Ekpo says defines success.

via punchng.com (Source)

Share this article:

More from Elena Vasquez

Elena Vasquez

Show full bio

Senior reporter covering technology and product news in Circular economy and the environmental industry at Circular Wire.

511 articles

Nearby routes

« Previous articleNext article »