The RPC's November 26 opinion rates the DESNZ Energy Independence Bill assessments not fit for purpose, with red ratings on asset visibility and national pricing measures.

UK Regulatory Policy Committee Publishes Scrutiny Opinion on DESNZ Energy Independence Bill Impact Assessments
UK Regulatory Policy Committee Publishes Scrutiny Opinion on DESNZ Energy Independence Bill Impact AssessmentsNickyPe / pixabay

Waypoints

  1. RPC published its scrutiny opinion on November 26, 2026, rating the Bill's impact assessments not fit for purpose

  2. Red ratings hit Measure 1 (Asset Visibility Installer Obligation) and Measure 19 (Reformed National Pricing)

  3. DESNZ claims £3.2bn NPSV from primary legislation, but £2.7bn sits outside RPC remit and £1.7bn comes from existing MEES rules

  4. Secondary legislation turns the package into a £220m annual net cost to business

  5. Secondary legislation development runs through 2027–2028 with Ofgem and DESNZ consultations

The UK Regulatory Policy Committee has rated the Department for Energy Security and Net Zero's impact assessments for the Energy Independence Bill "not fit for purpose," handing red ratings to two of the 18 measures in the legislative package.

The RPC published its statutory scrutiny opinion on November 26, 2026, after DESNZ introduced the Bill into Parliament on November 4 — one day after resubmitting its final impact assessments. The department used the Better Regulation Framework's urgent measures procedure, which lets departments submit an overarching impact assessment after collective agreement, so the committee scrutinised post-introduction: one summary assessment plus 17 individual measure assessments.

What did the committee actually find?

The framework rates proposals green or red on three criteria: rationale for intervention, identification of options (including the Small and Micro Business Assessment, or SaMBA), and justification of the preferred approach. The overarching rationale passed with a green. Two measures failed outright:

  • Measure 1, Asset Visibility Installer Obligation. The RPC found DESNZ failed to justify placing administrative burdens on small installers — EV charger, heat pump and rooftop solar PV registration — instead of pursuing Distribution Network Operator system reforms. It also flagged a missing £49m baseline cost.
  • Measure 19, Reformed National Pricing. DESNZ cited an indicative benefit of £10 billion to £20 billion across Great Britain's wholesale market but never linked that estimate to the specific enabling powers in the Bill. The committee called the derivation unempirical and noted deferral of key mechanisms to Ofgem and NESO.

That one unexplained £10bn–£20bn range is larger than the entire verified benefit case for the rest of the package — roughly three to six times the headline £3.2 billion figure.

Where does the £3.2 billion come from?

The summary assessment claims a Net Present Social Value of £3.2 billion from primary legislation, rising to £22.6 billion with secondary legislation. The RPC picked that apart:

  • £2.7 billion of the primary figure comes from Renewables Obligation reform, which sits outside the committee's remit.
  • £1.7 billion is attributed to enforcement of non-domestic Private Rental Sector Minimum Energy Efficiency Schemes. The RPC noted this reflects the remaining societal value of existing EPC Band E regulations under full compliance — in other words, DESNZ credited the new Bill with benefits from mandates already on the books.

On burden, the Equivalent Annual Net Direct Cost to Business works out as a net benefit of £150 million per year under primary legislation, driven by third-party intermediary transparency and non-domestic MEES. Secondary legislation flips that to an annual net cost to business of £220 million, mostly from domestic energy efficiency mandates.

Two other measures drew partial criticism despite passing. IA 3 and 9 (North Sea Mandate — repurposing the North Sea Transition Authority and ending new petroleum licensing) were scored "satisfactory but weak" because the summary reported oil and gas NPSV as an annual average rather than a cumulative total. IA 2 (Battery Storage consenting and safety oversight) and IA 20 (energy broker regulation, the main driver of the £150m business benefit) both passed clean.

The paperwork error the committee disclosed

DESNZ also informed the RPC, after the opinion was issued, that it had submitted incorrect draft versions of two assessments: Measure 16 (strengthening Ofgem) and Measure 25 (Warm Homes Agency). The committee excluded those ratings from the published report, and DESNZ may resubmit them for formal scrutiny.

What changes for commercial energy buyers?

For the recycling and resource sector specifically, the asset visibility rules matter most. Even though IA 1 was red-rated, DESNZ will revise rather than drop the registration mandates. Operators installing rooftop solar PV, heat pumps, battery storage or EV chargers at processing sites should expect mandatory registry filings with Distribution Network Operators — asset registers need to be current.

The non-domestic MEES finding tightens the screw on leased and commercial properties: rigorous enforcement will push retrofit schedules forward across commercial estates to hit EPC targets. And because network charging details are deferred, energy buyers contracting through PPAs need to model price volatility themselves rather than wait for the Bill to settle it.

The wider methodology fight

The findings illustrate a recurring tension between expedited primary legislation and Better Regulation analytical standards. Several assessments leaned on indicative figures while deferring cost-benefit quantification to secondary instruments. The committee also raised governance concerns about compliance with HM Treasury's Aqua Book guidance on modelling quality assurance, and it urged DESNZ to align with Climate Change Committee risk matrices and adopt consistent discounting, wage on-costs and fuel price baselines across all supporting documents.

The package projects 40 MtCO2e of cumulative carbon abatement between 2026 and 2060 — a modest share of Carbon Budget targets, in the committee's own framing.

What happens next

The Bill now enters committee stage in the House of Commons. DESNZ must address the red ratings before report stage, submit corrected assessments for Measures 16 and 25, and provide a refined options appraisal for installer registration plus empirical modelling for wholesale pricing. Secondary legislation runs through 2027 and 2028, with Ofgem and DESNZ consulting on code modifications, broker transparency codes and asset data standards. The revised assessments — and whether DESNZ can actually derive that £10bn–£20bn figure — decide what survives report stage.

via casrai.org (Source)

More from Elena Vasquez

Elena Vasquez

Show full bio

Senior reporter covering technology and product news in Circular economy and the environmental industry at Circular Wire.

591 articles

Nearby routes

« Previous articleNext article »