Industrial Decarbonization

Longi launches 680 W triple-protection module for C&I rooftops

Longi's new 680 W Hi-MO X10 module pairs a front-side light-receiving ratio of 98.58% with 25.2% efficiency, triple protection and 1.5 GW of Chinese C&I shipments in August 2026.

Longi presents 25.2%-efficient solar module with triple-protection design
Longi presents 25.2%-efficient solar module with triple-protection designAI-generated

By Daniel Okafor

Longi launched the Hi-MO X10 Full-Screen Triple-Protection solar module with 680 W of maximum output and 25.2% conversion efficiency, and says its 98.58% front-side light-receiving ratio is the highest it has achieved in a commercial product. The Chinese manufacturer introduced the module at an industry event in Qingdao, China, on Nov. 17; its triple-protection design specifically addresses reliability on C&I rooftops.

What changes in the 680 W design?

Longi kept the module at the standard 2,382 mm by 1,134 mm dimensions of its existing Hi-MO X10 line for distributed PV applications. Four structural changes expanded the light-receiving area by 759.3 cm² without changing that footprint.

  • Longi eliminated 20 white gaps between cells with a low-temperature film-welding process that bonds cells at ambient temperature before low-heat lamination. The process limits height differences to 130 micrometres and recovers 178 cm².
  • It moved three front-side busbars to the rear, adding 294 cm². Thinner profiles and staggered positioning are meant to reduce microcrack risk associated with rear-side busbar stacking.
  • Inter-string spacing fell from 1.48 mm to 1 mm.
  • Cell-to-frame creepage distance shrank from 12.9 mm to less than 9 mm through upgraded insulation materials.

Longi set a 670 W standard rating for volume production, 20 W above mainstream TOPCon modules of the same size. Maximum front-side output reaches 680 W.

To limit rear-side shading from the relocated busbars, Longi replaced flat ribbons with round wire, added precision-insulated sub-busbar break points and designed an alloy frame profile to stop its C-shaped section from shading cells. Those changes increased rear-side light-receiving area by 2.5% and support a maximum bifaciality of 85%.

The redesign gains power mainly by exposing more of the cell surface rather than changing the module footprint.

How does the module protect rooftop systems?

Longi’s triple-protection design targets hotspots, electrical arcing and microcracks, three reliability risks it considers significant on commercial and industrial rooftops.

  • Hotspot protection: Each hybrid passivated back contact (HPBC) 2.0 cell includes additional structures equivalent to bypass diodes, which Longi says can limit hotspot temperatures to below 100 C.
  • Arcing protection: Laser fusion welding in the junction box eliminates metal-to-metal interface gaps that can contribute to direct-current arcing.
  • Microcrack protection: The low-temperature cell-welding process and thinner busbars reduce mechanical stress during transport and installation.

Together, the three measures address heat, arcing and fracture without changing the module’s commercial dimensions.

What do the certifications cover?

Longi says TÜV SÜD and TÜV Rheinland have certified the module under IEC 61215 and IEC 61730. Those certifications cover the module’s design and performance requirements.

Longi also reported double-stress testing for potential-induced degradation (PID), light-induced degradation (LID), and light- and elevated-temperature-induced degradation (LeTID). Additional results cover level-six salt-mist, ammonia and dust tests, plus hail-impact qualification using 25 mm and 35 mm hailstones.

The 15-year materials warranty and 30-year linear power-output warranty specify maximum first-year degradation of 1% and annual linear degradation of no more than 0.35%.

The module now carries third-party certification and a 30-year output commitment behind its reliability claims.

How quickly has it reached the market?

Longi said shipments of Hi-MO X10 Triple-Protection modules reached 1.5 GW in China’s C&I market in August 2026. During the first nine months of 2026, triple-protection variants accounted for more than half of the company’s distributed PV shipments.

That gives the product a measurable commercial presence in its home market, although Longi did not provide module pricing or a future shipment target.

“The company’s hybrid interdigitated back-contact (HIBC) solar cell had achieved a conversion efficiency of 28.29%,” Longi Chairman Zhong Baoshen said, citing internal laboratory results. The result approaches the 29.4% theoretical crystalline-silicon efficiency limit cited by Longi. He positioned the full-screen module as a complementary way to raise output through structural optimization alongside further cell-efficiency gains.

Longi has commercial traction in China, while the higher cell-efficiency result remains a laboratory result.

What milestone comes next?

With no new shipment target, price or regulatory deadline disclosed, the next hard market checkpoint is the 30-year linear power-output warranty: Longi must meet the 1% first-year and 0.35% annual degradation limits over that period. Field performance against those terms will determine whether the reliability case supports wider C&I adoption.

via pv-magazine-australia.com (Source)

Share this article:

More from Daniel Okafor

Daniel Okafor

Show full bio

Correspondent covering companies, deals and strategy in Circular economy and the environmental industry at Circular Wire.

561 articles

Nearby routes

« Previous articleNext article »