
£200m Welsh Carbon Capture Plant Deferred Over Consultation Gap
A £200m Welsh carbon capture plant has been deferred — not over money or technology, but because consultation with the English side of the border never happened.
ROUTE /project deferral · Topic

A £200m Welsh carbon capture plant has been deferred — not over money or technology, but because consultation with the English side of the border never happened.
A £200m Welsh carbon capture project is on hold after the developer missed required English consultation, exposing cross-border p…