Compliance & Policy
OSMRE Extends SMCRA Conflict-of-Interest and Land Unsuitability Rules
OSMRE renewals keep 2,196 annual Form OSM-23 conflict-of-interest filers and Part 764 unsuitability petitions, at up to 1,200 hours each, on a three-year extension track.

Waypoints
Document 2026-24264 extends 30 CFR Part 705 without change; 2,196 respondents file 4,415 Form OSM-23 disclosures annually, totaling 755 burden hours.
Part 764 petitions (Document 2026-24282) run 70–1,200 hours each, with 2,500 total annual burden hours across 2 entities.
SMCRA Section 517(g) carries criminal penalties up to $2,500 in fines and one year imprisonment for undisclosed coal financial interests.
Part 705 comments close 29 January 2027; Part 764 comments close 30 December 2026.
Federal Register publication is set for 30 November 2026, with OMB clearance extending both collections three years.
The U.S. Office of Surface Mining Reclamation and Enforcement is extending two information collections that keep state coal regulators filing annual financial disclosures and keep unsuitability petitions for surface coal mining alive, with Federal Register publication set for 30 November 2026.
The principal filing, Document 2026-24264, proposes an extension without change of 30 CFR Part 705 — the rule restricting financial conflicts of interest among personnel who run state coal mining programs. The companion filing, Document 2026-24282, moves forward the collection under 30 CFR Part 764, which governs petitions from citizens, conservation groups, and research bodies to designate lands unsuitable for surface coal mining. Both renewals are made under the Paperwork Reduction Act of 1995 and trace their authority to the Surface Mining Control and Reclamation Act of 1977.
What does Part 705 actually require?
State regulatory authorities must collect annual disclosures from every employee, advisory board member, and technical consultant performing statutory functions. The vehicle is Form OSM-23, the State Employee Statement of Employment and Financial Interest. Covered personnel disclose employment, securities, real property, and creditor relationships tied to commercial coal mining operations — including holdings of spouses and resident minor children.
The scale is modest but steady: 2,196 annual respondents, 4,415 filings, and 755 total burden hours per year. That averages out to roughly 20 minutes per filing, with individual responses ranging from 5 minutes to an hour. OMB Control Number 1029-0067 covers the collection, and annual non-hour costs are listed at $0.
The statutory teeth sit in SMCRA Section 517(g), codified at 30 U.S.C. § 1267(g). Regulatory personnel who knowingly hold direct or indirect financial interests in coal mining operations face criminal penalties of up to $2,500 in fines and one year of imprisonment. The rule backs that up with mandatory disciplinary action or asset divestment for non-compliant staff — a zero-tolerance standard that overrides the de minimis thresholds many institutional conflict policies carry.
What does the Part 764 petition process demand?
The second collection is a different animal entirely. Under 30 CFR Part 764, petitioners must present technical, hydrological, and geological evidence showing that reclamation is infeasible or that mining would damage fragile resources. State authorities then evaluate petition validity, issue public notices, hold hearings, and render formal written findings.
The burden numbers tell the story: 2 entities and 5 administrative submissions annually, but 2,500 total burden hours — between 70 and 1,200 hours per petition. That's the interdisciplinary work of hydrologic modeling, baseline water chemistry analysis, and spatial mapping of endangered aquatic species habitats. There's no standard form; petitioners submit evidentiary dossiers. OMB Control Number 1029-0030 covers this collection, with $455 in annual non-hour costs.
SMCRA Section 522 distinguishes mandatory unsuitability designations — where technological or economic factors preclude effective reclamation — from discretionary ones covering renewable resource lands, historic sites, and fragile environmental buffers.
Who should be paying attention?
Cooperative federalism is the operating model: 24 coal-producing states hold primary regulatory authority, and OSMRE's disclosure protocols protect the administrative validity of state-issued permits by blocking conflict-of-interest challenges. For practitioners, three groups carry direct exposure:
- Faculty consultants and advisory appointees — academic scientists in geology, civil engineering, and environmental biology who consult for state regulators or sit on review boards must file Form OSM-23, disclosing family coal-related equities, royalties, and retainers.
- University compliance offices — research integrity officers must align campus disclosure policies with SMCRA's zero-tolerance standard, which tolerates no coal financial interests for anyone executing regulatory duties.
- Research teams behind petitions — university watershed analyses and ecological baseline studies often form the empirical core of Part 764 dossiers, and data provenance must withstand administrative challenge.
Faculty receiving corporate research support from coal operators cannot simultaneously perform state regulatory advisory duties without risking statutory ethics violations — that firewall is not optional.
When do the comment windows close?
The two renewals run on different clocks. The Part 705 collection carries a 60-day comment window closing on 29 January 2027, with written comments on Form OSM-23 reporting burden, electronic submission modernization, and disclosure clarity going to William Frankel, Information Collection Clearance Officer, OSMRE, 1849 C Street NW, Room 4512, Washington, DC 20240, or by email.
The Part 764 collection, following an earlier 60-day notice on 14 August 2026 (91 FR 52711), is a 30-day notice submitting the ICR to OMB for final review. Those comments are due by 30 December 2026 through the federal portal at reginfo.gov, with a copy to OSMRE.
After the comment periods, OMB issues formal clearance determinations extending both collections for another three-year cycle. That determination is the milestone that decides what happens next.
via casrai.org (Source)
Filed underSurface Mining Control And Reclamation ActOsmreCoal Mining RegulationConflict Of InterestLand Unsuitability
More from Elena Vasquez
Show full bio
Senior reporter covering technology and product news in Circular economy and the environmental industry at Circular Wire.
601 articles