Compliance & Policy

OSMRE Seeks Renewal of Mine Reclamation Grant Reporting Regime

OSMRE filed on 27 November 2026 to extend OMB Control 1029-0059 unchanged, keeping 279 annual grant filings and 2,423 burden hours for state and tribal mine reclamation programs. Comments close 29 January 2027.

Interior Department Updates Surface Mining Control and Reclamation Act Grant Reporting Rules
Interior Department Updates Surface Mining Control and Reclamation Act Grant Reporting RulesJordyMeow / pixabay

Waypoints

  1. OSMRE filed the renewal notice 27 November 2026; Federal Register publication 30 November 2026 as Doc. 2026-24267.

  2. The collection covers 27 respondents, 279 annual submissions, and 2,423 annual burden hours.

  3. IIJA 2021 appropriated $11.3 billion over 15 years for state and tribal AML programs.

  4. States may place up to 30 percent of annual AML funds into acid mine drainage set-aside accounts.

  5. The 60-day comment window closes 29 January 2027.

The Office of Surface Mining Reclamation and Enforcement filed a Federal Register notice on 27 November 2026 to renew, without change, the reporting regime that moves federal grant money to state and tribal mine reclamation programs — a paperwork pipeline of 279 annual submissions and 2,423 burden hours. The extension carries OMB Control Number 1029-0059 and is scheduled for publication on 30 November 2026 as Document Number 2026-24267. A 60-day comment window closes on 29 January 2027.

The notice asks the Office of Management and Budget, under the Paperwork Reduction Act of 1995, to extend the information collection that governs grant applications, financial tracking, and performance reporting. The framework transfers federal funds to state regulatory authorities and federally recognized Indian tribes, and it binds university environmental research partners who monitor watershed restoration and abandoned mine land mitigation as subrecipients.

What does the framework actually require?

The statutory base is the Surface Mining Control and Reclamation Act of 1977, which splits responsibilities between regulating active surface coal mining and remediating lands mined before 3 August 1977. The law mandates contemporaneous reclamation and vegetative restoration, a sharp break from open-pit practices that left unstable highwalls and toxic drainage.

Federal regulations at 30 CFR Chapter VII set the administrative boundaries. Part 735 governs grants for program development and administration; Parts 885 and 886 dictate reclamation grants for certified and uncertified states and tribes. Grantees complete three standardized reporting instruments:

  • Form OSM-47, the Budget Information Report, requiring breakdowns of personnel salaries, equipment, travel, and contracts.
  • Form OSM-49, the Budget Information and Financial Reporting form, providing annual accounting of federal outlays, matching contributions, and program income.
  • Form OSM-51, the Performance and Program Narrative, capturing reclaimed acreage, highwall elimination, acid mine drainage treatment installations, and water monitoring data.

OSMRE estimates an active universe of 27 state and tribal governmental respondents. Completion times range from 1 to 15 hours depending on filing complexity, with zero non-hour capital costs.

How does the money flow?

Award execution must conform to the Uniform Guidance at 2 CFR 200, which governs financial systems, procurement integrity, internal controls, and subrecipient monitoring. The stakes grew substantially after the Infrastructure Investment and Jobs Act of 2021, which appropriated $11.3 billion over 15 years for state and tribal Abandoned Mine Land programs — money now funding geochemical remediation, critical mineral recovery from mine drainage, and watershed restoration.

For academic laboratories receiving sub-awards through state mining departments, compliance with 2 CFR 200 Subpart E cost principles is required for direct testing costs, specialized instrumentation depreciation, and negotiated indirect rates. Research offices must map institutional accounting to the OSM-47 and OSM-49 budget categories, and institutions must maintain auditable effort certifications and sample custody records for three years after closeout.

What does this change for the states and researchers?

In practice, nothing changes immediately — the request proposes an extension without change. But the renewal locks in predictable administration that state regulators have defended. Through resolutions of the Interstate Mining Compact Commission, member states have stressed that steady federal grant distributions are necessary to maintain inspection personnel, engineering specialists, and environmental monitoring infrastructure. The commission backs statutory provisions allowing states to place up to 30 percent of annual AML funds into dedicated acid mine drainage set-aside accounts to fund long-term water treatment facilities.

The scientific side of the ledger stays intact as well. The U.S. Geological Survey Water Resources Mission Area operates monitoring networks that track surface water chemistry, heavy metal attenuation, and groundwater recharge across coal basins, and those data substantiate Form OSM-51 narratives documenting environmental recovery.

What decides what happens next?

Comments citing OMB Control Number 1029-0059 may go to William L. Frankel, Information Collection Clearance Officer, Office of Surface Mining Reclamation and Enforcement, 1849 C Street NW, Room 4512, Washington, DC 20240, or by email. Regulators, tribal leaders, academic researchers, and public stakeholders may weigh in on reporting burden and electronic submission methods. After the window closes on 29 January 2027, OSMRE will submit the package to OMB's Office of Information and Regulatory Affairs for final approval — the milestone that determines whether the 2,423-hour annual reporting regime continues on its current terms.

via casrai.org (Source)

More from Grace Kim

Grace Kim

Show full bio

Market editor covering money, funding and market shifts around Circular economy and the environmental industry at Circular Wire.

619 articles

Nearby routes

« Previous articleNext article »