
CNPC Commissions 277.6-km CO2 Pipeline at Jilin Oilfield
CNPC's 277.6-km Jilin pipeline entered commercial operation with capacity for 3.3 million metric tons of CO2 a year, linking capture units to enhanced oil recovery.
ROUTE · Topic

CNPC's 277.6-km Jilin pipeline entered commercial operation with capacity for 3.3 million metric tons of CO2 a year, linking capture units to enhanced oil recovery.
A record 700 CCS lobbyists at Cop31 in Antalya, and for the first time CDR and CCS made it into text shaping the final deal — as…
The UK's raid on green spending leaves carbon capture developers facing a tougher future, with financing, timelines and emitter c…