
CNPC Commissions 277.6-km CO2 Pipeline at Jilin Oilfield
CNPC's 277.6-km Jilin pipeline entered commercial operation with capacity for 3.3 million metric tons of CO2 a year, linking capture units to enhanced oil recovery.
ROUTE /co2 pipelines · Topic
6 stories on this route

CNPC's 277.6-km Jilin pipeline entered commercial operation with capacity for 3.3 million metric tons of CO2 a year, linking capture units to enhanced oil recovery.
Global CO2 transport infrastructure needs $211 billion by 2060 to move 3 gigatons a year, with Asia Pacific absorbing nearly 60%…
DeSmog investigates grassroots resistance to CO2 pipeline routes, where landowner opposition and permit fights now gate the pace…